The Proposed Port Macquarie Orbital Road
Consultation has concluded
The proposed Orbital Road consists of the collective East-West Link (Ocean Drive to Oxley Highway), the North-South Link (Oxley Highway to Boundary Street) and the flood-free Primary Airport Access Road. This proposal aims to improve connectivity to key destinations including the Health and Education Precinct, the Airport and the Regional Sports Stadium and alleviate traffic congestion.
The most viable route has been identified from an engineering perspective, however the project is only in very early stages and the final route is yet to be determined. Comprehensive technical and environmental investigations will be required before the final route is confirmed.
Council is committed to engaging with our community on this important project so we can make the best possible decisions based on the interests and concerns of our community. Over the past months we have invited feedback from the community via a range of methods including submissions, surveys, meetings and information sessions.
The initial consultation period for the proposed Orbital Road project has now concluded. All submissions, surveys and feedback received to date will now be collated and analysed for inclusion in an engagement report which will be presented to Council in June, for a decision to determine the next stage of the project.
IMPORTANT NOTE: At the June 2019 Council Meeting, a decision was made to develop a Strategic Business Case to review all route options to improve traffic flow and how these compare with, or complement possible improvements to the existing road network, such as planned upgrades to Lake Road and Ocean Drive, as well as State-managed roads like the Oxley Highway. For more information on this, please visit: Port Macquarie Transport Network Planning.
For more information please refer to:
- Final Feasibility Report
- Project Information Brochure
- Investigation Corridor Map
- Investigation Corridor Maps - zoomed in locations
- Proposed Orbital Road Presentation
- Proposed Orbital Road Information Posters
- Area Wide Traffic Study Vol 1-4 (available in the Document Library)
- Area Wide Traffic Study plain English version
Fact Sheets:
- Identifying a corridor for the Orbital Road
- Corridor Protection for Future Road Infrastructure
- Environmental Considerations for the Proposed Orbital Road
- Proposed Orbital Road Investigation: Fact Sheet One
- Proposed Orbital Road Investigation: Fact Sheet Two
Proposed Orbital Road Strategic Business Case
or reference the document library to the right (or below if on a mobile device).